FLOOR SYSTEM APPLICATION VIDEO
NEOCEMENT
FLOORING SYSTEM
1. PRIMING
- On concrete, apply SX0 PrimeWell.
- On Glazed tiles, apply Neogrip.
2. NEOFILLER BASE COAT
- On uneven horizontal surfaces, apply Neofiller.
- On even and smooth surfaces, apply Neocement.
3. NEOCEMENT
Apply Neocement in two coats. Once the first coat has dried, apply the second coat, wait for it to harden before sanding the surface with a 150 or 220 grid.
4. PROTECTIVE COAT
Apply the appropriate protective topcoat depending on the intended use of the surface and its location. Refer to the intended use table of the brochure and technical data sheet for additional details.