WALL SYSTEM APPLICATION VIDEO
NEOCEMENT
WALL SYSTEM
1. SURFACE PREPARATION
- On concrete, apply Colortek Fondo F.
- On glazed tiles, apply Colortek XT/XF system.
2. NEOCEMENT FIRST COAT
Apply the first Neocement coats and let it dry.
3. NEOCEMENT SECOND COAT
Apply the second coat and let it dry before sanding the surface with a 150 or 220 grid.
4. PROTECTIVE COAT
Apply the appropriate protective topcoat depending on the intended use of the surface and its location. Refer to the intended use table of the brochure and technical data sheet for additional details.